G3 Pipe Sizing: The Four-Step Method and Every Question Type

Pipe sizing questions look like the hardest thing on the G3 exam and are the most mechanical once you know the order. It is the same four steps every time.

The four steps

  1. Find the LMR. The Longest Measured Run — meter to the farthest appliance. Always the longest single path.
  2. Choose a column at or above the LMR, rounding up. Never down.
  3. Add the section load. The total BTU/h of every appliance fed by that section of pipe.
  4. Read the pipe size. In your column, the first row whose capacity meets or exceeds the load. Round up again.

Two rules that never change

Where a value falls between two, take the larger one. Every time.

Which table

Natural gas uses Annex A; propane uses Annex B. Inside each, pick the sub-table matching the material — steel pipe or copper tubing. Reading the right table is half the marks; the arithmetic is the easy part.

Identify the scenario first

Every pipe sizing question on the exam is one of ten shapes. Recognising which one you are looking at tells you what to do before you touch a table.

#ScenarioHow you know
01Straight runOnly one appliance shown, no tees
02Single pipe systemSeveral appliances, one material, tees shown
03Combination systemTwo materials, such as steel and copper
04Manifold systemThe word "manifold" appears in the question
05Find the missing pipe sizeOne section marked with a "?"
06Find the maximum BTUPipe size given, asks for capacity
07Column selection only"Which column?" or "Is this correct?"
08Medium pressureSupply pressure given in psig, above 14" w.c.
09System extensionThe words "adding" or "extending" an appliance
10Propane system"Propane" or "LP" mentioned — Annex B, not A

Where people lose marks

Common questions

What does LMR mean in gas pipe sizing?

LMR stands for Longest Measured Run — the distance from the meter to the farthest appliance on the system. It is always the longest single path, and it is the first thing to establish when sizing pipe.

How do you size gas pipe using the B149.1 tables?

Find the Longest Measured Run, choose a column value at or above that length rounding up, add the total BTU/h load carried by the section, then read down that column to the first pipe size whose capacity meets or exceeds the load — again rounding up.

Do you round pipe sizing up or down?

Always up. Round the column value up to at least the measured run, and take the first pipe size whose capacity meets or exceeds the load. Where a value falls between two, take the larger.

Which annex do you use for propane?

Natural gas systems use the Annex A tables and propane uses Annex B. Within each, use the sub-table matching the material — steel pipe or copper tubing.